This article applies to Aiwyn Practice.
In this lesson you log one week of your own client time on the timesheet, check your totals in the summary row, and submit the timesheet to your firm's approval workflow. This is the loop every staff member repeats each period, and getting it right the first time means your hours reach billing without a manager sending them back. It takes about 20 minutes once you have the details of your week to hand. Before you start, you need access to the Timesheet module and permission to create your own time entries, and at least one active client with a project you are assigned to.
Before you start
Gather the details of the week you are about to log:
- The client and project you worked on. If you worked on more than one, pick one for this lesson and add the others afterwards using the same steps.
- Roughly how many hours you spent on it each day.
- The work code your firm uses for that kind of work. If you are not sure which code to pick, ask your manager or whoever set up your firm's Aiwyn Practice before you start; picking the wrong code is the most common reason a timesheet is sent back.
You work through the same five steps whatever the client and project are, so the walkthrough below refers to "your client", "your project" and "your work code" rather than a specific example.
Step 1: Open the timesheet
Open Timesheet. You don't need to change anything: Week is the default view and the staff filter defaults to My Own, so the page already shows your own current week.
You see the entry grid for the week, with the date range label in the toolbar showing the period, for example "Mar 08 to Mar 14". If you have not logged anything yet, the summary row across the top of the grid reads Total Hours "0.0 + 0.0 draft" and Billable "0.0 — 0% utilization".
If the week you want to log is not the one shown, see Work with the timesheet view to change the period, then come back here.
Step 2: Log your first entry
- Select + Add Entry at the bottom of the page. The New Time Entry dialog opens with the Time tab selected.
- Set Start Date & Time to the first day of the week you worked on the project. It defaults to the current date and time, so change the date if needed.
- Choose the hours you worked that day from the Duration dropdown. The values offered depend on the time increment your firm has set, so pick the closest value if your exact figure is not listed.
- Leave Assignee as your own name.
- In Client, search for and select your client. Start typing the client's name and pick it from the results.
- In Project, select your project. Only projects linked to the selected client appear here, so if the list is empty you may have picked the wrong client.
- In Work Code, select the code your firm uses for this kind of work.
- Expand Notes and comments and, in Notes (Client-Visible), write a line the way the client would want to read it on an invoice: what you did, in plain language, without internal shorthand.
- Select Create Time Entry.
The dialog closes and the entry appears in that day's row of the grid. The summary row updates: Total Hours now shows the hours you logged, counted as draft until the timesheet is submitted, and Billable shows the same hours with 100% utilization, because every hour logged so far is billable.
If your client or project does not appear in the dropdowns, stop here and see Restore a missing client or project in the entry dropdowns before continuing.
Step 3: Fill in the rest of the week
Repeat Step 2 for each remaining day you worked, changing Start Date & Time to each day and Duration to the hours you worked. Keep the same client, project and work code, and write a fresh Notes (Client-Visible) line for each day. If you worked on a second client or project during the week, log those days the same way, choosing the other client and project in the dialog.
After each entry, the new row appears under its day in the grid and the summary row totals grow. Entries are saved as soon as you create them, so you can leave the page and come back without losing anything.
Step 4: Check your totals
Read the summary row across the top of the grid before you submit.
- Total Hours should match the hours you worked this week.
- Billable should show the same hours, with a utilization percentage. Utilization is your billable hours divided by your total hours, so for a week made up entirely of client work it reads 100%.
If a number looks wrong, select the entry row in the grid to open it, correct the field and select Save. Everything is still in draft, so you can add, edit or delete entries freely until you submit.
When the totals match your week, you are ready to submit. For a full week of client work the summary row might read, for example, Total Hours 38.0 and Billable 38.0 — 100% utilization.
Step 5: Submit the timesheet
Select Submit Timesheet at the bottom-right of the page.
Submission sends your entries to the approval workflow your firm has configured, and the entries move from draft to pending approval. Your submission is also your confirmation that the hours are accurate.
Once submitted, an entry can't be moved back to draft. Changing it needs the Edit Submitted Entry permission, which standard staff don't usually hold, so a manager may need to return the timesheet for revision.
What you did
You logged a week of your own client time as separate daily entries, each tied to a client, a project and a work code, with a client-visible note that can appear on the invoice. You used the summary row to check that your total and billable hours matched your week, then submitted the timesheet so your hours could be approved and flow into WIP for billing.
Next steps
- To log expenses, operational time, time off, or an entry for a colleague, see Log and manage time entries.
- To change the period shown, switch to the calendar layout, or view another staff member's entries, see Work with the timesheet view.
- To fix an entry after you have submitted, see Submit and correct a timesheet.
- If the client or project you need is missing from the dropdowns, see Restore a missing client or project in the entry dropdowns.
- To understand where your hours go after submission, see How a time entry moves from draft to billed.
- For what each summary row metric and entry field means, see Timesheet screen and field reference.