This article applies to firms using Aiwyn Practice.
Find a project missing from Project Performance by checking the report filters and the project's Target Due Date. If the project is correctly dated and still missing after the report refreshes, contact Aiwyn Support.
Before you start
- Project Performance is available only to firms on Aiwyn Practice.
- You need access to Reports and permission to view and edit the affected project, including its dates. The documented Reports permissions are View Module and View. If Reports or the project-editing controls are unavailable, ask your firm administrator to check your effective permissions. See Report access permissions by role.
- The report's target end date is the project's Target Due Date, set under Project Dates on the project's Details tab. It is not the actual completion date or an individual task's due date.
- Projects without a Target Due Date are excluded from Project Performance. Active Projects and Active Projects Over Budget ignore the report's Date filter, but that does not make undated projects eligible for the report.
- The documented reporting history is the current calendar year and the two prior years. When checking date-filtered results, use a Target Due Date within that history. Do not change a valid historical due date just to force a project into a more recent reporting period.
- Make the date change on the project in Aiwyn Practice.
Steps
Check whether the date range is hiding the project
The Date filter defaults to the previous month and selects projects by Target Due Date for the date-filtered Insights results. The two active-project KPI tiles are exceptions: they ignore this filter.
- Select Reports in the left sidebar, then select Project Performance.
- Select the Date filter and choose a range that includes the project's Target Due Date. For a project due this calendar year, use This Year to check beyond the default previous-month window.
- Clear other filter selections that could exclude the project, such as Client, Project Status, partner, manager, or service line.
- Select the Project filter and look for the project. If it is available, select it, then open Project Performance Insights.
If the project is listed, it was hidden by the report filters and you're done. If it is still missing, check its Target Due Date in Projects. A missing filter option is not, by itself, proof that the project has no due date.
Check or set the project's Target Due Date
- Select Projects in the left sidebar, then select All Projects.
- Enter the project name in the Search box.
- Select the project row to open the project record.
- In the side panel, review the project's dates under Details. If its Target Due Date is already correct and inside the report's date range, do not change it; continue to the refresh check below.
- Select Edit Project in the side panel, then select the Details tab. Alternatively, use ⋯ → Edit on the project's row in the Projects list.
- Under Project Dates, set or correct Target Due Date. Use the genuine target deadline, not an arbitrary placeholder, today's date, or the actual completion date.
- Select Save.
Confirm the project now appears
- Allow about 60 minutes for the saved change to reach the reporting warehouse. This is typical latency, not a guaranteed deadline. See Report data latency by source system.
- Reopen Reports → Project Performance.
- Select the Date filter and choose a range that includes the saved Target Due Date. Recheck the other filters too; reopening or navigating between reports can reset filters.
- Select the Project filter and choose the project if it is available.
- Select the Project Performance Insights tab and look for the project row.
The expected result is that the project appears in the date-filtered Insights grid. Its contribution to each KPI also depends on its status and the metric's eligibility rules. Adding a due date does not mark a project complete, and the Active Projects tile is not a reliable way to verify this change.
Project Performance does not flag undated projects or show a count of those exclusions. Its completion and budget figures can therefore represent only part of your firm's work. Check other projects for missing Target Due Dates too; do not treat the report as a complete inventory of projects.
If a project has a correct Target Due Date inside the selected range and is still missing after the expected refresh, contact Aiwyn Support. Include the firm, project and client names or identifiers, the saved Target Due Date, when you saved it, and a screenshot of the report tab and filter selections. Correctly dated projects and clients can also be missing because of a reporting defect; repeatedly changing their dates is not the remedy.
Find other projects with missing dates
Use the operational Projects list, not Project Performance, for this check.
- Open Projects → All Projects and clear any existing search and column filters that would narrow the list.
- Use the Columns panel to show Target Due Date if it is hidden.
- Select Export to download the current view, then review the exported Target Due Date column for blank values.
- Confirm the correct target deadline for each undated project, then update the project using the steps above.
The list and export reflect the projects you can access. For a firm-wide check, have an administrator or another user with firm-wide project visibility perform it. This export-and-review method does not depend on the date column offering a specific Blank filter option.
If the project is already completed
Use the correct original target deadline if it can be verified; do not invent a date to improve the report's coverage or rates. After the refresh, check the historical date range that includes that deadline. If you need to correct previously reported completion or budget rates, ask Aiwyn Support to confirm the historical result. Automatic backfill of those rates after adding a missing due date has not been verified.
Related
- Report reference
- How report data is produced and scoped
- Report data latency by source system
- Filter a report
- Report access permissions by role
- Manage a project record
- How project status and due dates affect what you see