This article explains what has to happen before work appears in WIP, what keeps it there, and the ways it can leave.
Work enters WIP when it's approved, not when it's logged
Staff record time in Timesheet against a project. A time entry has no effect on WIP while it's a draft or while it's submitted and waiting for approval. It enters WIP once it is approved. If your firm does not use a separate approval step, submitting the timesheet approves the entry automatically. Non-billable time never enters WIP.
An expense must be posted and approved where approval is required before it reaches WIP.
This is why the hours a staff member has logged and the value in WIP are different numbers. WIP holds work the firm intends to bill, not all the work that was done. For the full path a time entry takes, see How a time entry moves from draft to billed. For which time counts as billable, see How Aiwyn classifies billable, non-billable and operational time.
WIP shows value by project, as of a date you choose
A row in WIP is a project, not a time entry. Aiwyn totals the approved, unbilled work on each project into Unbilled Time, Unbilled Expenses, Unapplied Progress and Unbilled Overall. The individual entries behind a total appear once the work is on a draft invoice.
Every total is calculated as of the date in Unbilled as of, which defaults to today. The cutoff uses the date on the time or expense entry, not its submission or approval date. Work dated after the cutoff is left out, so the same project can show different totals on different dates. For the formulas, see WIP amount calculations reference.
Unbilled Overall is Unbilled Time plus Unbilled Expenses, minus Unapplied Progress. It can be zero or negative even while work remains to be reconciled.
Nothing removes work from WIP on its own
Approved, unbilled work stays in WIP until someone bills it or writes it off. It doesn't age out, and closing or completing its project doesn't bill or write it off. By default, WIP shows active, open projects; a firm setting can also show non-open projects with non-zero unbilled time, expenses or progress. See What counts as WIP.
A draft reserves a project, and sending the invoice clears its work
Work moves toward billing when it's put on a draft invoice. There are three ways that happens, and they all produce the same kind of draft in Draft Invoices:
- Select projects in WIP and select Create Invoice.
- Select Create Invoice in Draft Invoices, then choose the client and projects.
- Let Auto Generate create a draft for a project with a non-Manual billing schedule.
Once the draft exists, the path that created it doesn't change how it is reviewed or sent. See Create or add to a draft invoice from WIP.
A project can be on only one open draft at a time. The open draft reserves the entire project, so it cannot be added to another draft and Auto Generate skips it. New time and expenses can still post to WIP; add that new work to the existing draft.
Creating a draft does not clear the project's unbilled balance. Its work remains unbilled until the finalized invoice is sent. At send, the included entries leave WIP, the issued invoice appears in Invoices, and the billed amount counts toward the project's Billed to Date.
A write-down changes what's billed, not what the work was worth
A write-down bills work for less than its recorded value. A write-up bills it for more. Both happen on the draft invoice, not in the WIP grid. You can change the amount for a whole project, one staff member's work or a single entry. The original time records are kept as logged.
The draft keeps both figures side by side. WIP Value is what the work was worth, Invoice Amount is what the client will pay, and Write Up/Down is the difference. Realization is Invoice Amount divided by WIP Value.
When the invoice is sent, a written-down entry leaves WIP in full. Its billed amount counts toward Billed to Date, and the difference is recorded as a write-down rather than staying behind as unbilled work. See How WIP becomes a draft invoice line item and How realization is calculated.
A write-off removes work without billing it
A write-off clears work the firm has decided never to bill. Write-offs are performed on a draft invoice, not in the WIP grid:
- Put the work on a draft.
- Set its Invoice Amount to 0.
- Move the draft through review.
- Send or post it. Use Download / Print when the invoice should not be emailed to the client.
The work is written off only when the invoice is sent or posted. Its whole unbilled value leaves WIP, nothing is added to Billed to Date, and the written-off amount is recorded separately.
A WIP write-off happens before billing. Writing off a balance in Accounts Receivable happens after billing and is a different action. See How write-offs differ from credit adjustments.
Removing work from a draft puts it back in WIP
Several actions on a draft look like they get rid of work, but they return it to WIP instead:
- Clearing an entry from a draft returns it to WIP. It is not written off.
- Deleting a draft returns every time and expense entry on it to WIP and releases its projects.
- Leaving an entry off an invoice keeps it in the project's unbilled balance until it is billed later or written off.
An entry also cannot be split across invoices. The whole entry is either included or excluded.
Progress billing bills ahead of the work
A progress bill invoices a fixed amount that is not tied to specific time entries, such as a monthly retainer. It creates Unapplied Progress on the project, which is later applied against time and expenses as the work is done.
In the WIP grid, Unbilled Overall subtracts unapplied progress from unbilled time and expenses. Sending a progress invoice increases Unapplied Progress; sending a later invoice that applies progress reduces it by the amount applied.
Auto Generate does not apply unapplied progress automatically. Apply it while reviewing the draft.
Each step around WIP belongs to a different module
WIP totals unbilled work and sends it on to billing. The steps on either side belong to other modules:
- Time missing from WIP is usually a Timesheet, approval, project-status or cutoff-date question.
- An amount that needs changing is a draft invoice task.
- A wrong fee or billing schedule is corrected on the project.
See Troubleshoot unexpected WIP.
Related
- What counts as WIP
- How a time entry moves from draft to billed
- How Aiwyn classifies billable, non-billable and operational time
- How WIP becomes a draft invoice line item
- What happens when a draft invoice is returned or deleted
- How realization is calculated
- How write-offs differ from credit adjustments
- Create or add to a draft invoice from WIP
- Write down or write off unbilled work
- Troubleshoot unexpected WIP
- WIP amount calculations reference