This article applies to firms using Aiwyn Practice.
Mark projects, stages and tasks as eligible for work pools, either once on a project template so every future project feeds the pools, or on an existing project that is already underway.
Before you start
- Work Pools is turned on for your firm and at least one pool exists. See Create and manage work pools.
- You can edit the template or project. Adding existing work to pools also uses the Create Work Pool permission.
- Marking work eligible does not by itself put it in a pool. It must also match a pool's filters and have no assignee or owner. See How work pools decide what staff can see and claim.
Steps
Set eligibility on a project template
Use this for work your firm does repeatedly. Every project created from the template carries the settings.
- Select Settings in the left sidebar, then Project Templates under Project Management.
- Open the template.
- Under the template name, tick one or both:
- Add projects created using this template to work pools makes the whole project claimable.
- Add tasks from projects created using this template to work pools ticks every task row at once.
- To be selective instead, leave the template-wide tasks box unticked and tick Add this task to work pools on individual task rows. Unticking one task after ticking the template-wide box turns that box indeterminate, which is expected.
- To make a stage claimable as a whole, tick Add this stage to work pools on the stage row. Stage and task settings are independent; ticking a stage does not tick its tasks.
- Select Save.
Projects you create from this template from now on arrive with the matching checkboxes already ticked. Projects created earlier are not changed.
Add an existing project to work pools
- Open the project.
- Open the project's details side drawer and select the Detail tab.
- Tick Show this project in work pools.
The change saves immediately. The project appears as its own row in any pool whose Work Items includes Projects and whose filters it matches, as long as the project has no owner.
Add an existing stage to work pools
- Open the project's tasks list.
- On the stage (section) header, tick Show this section in work pools.
The stage appears as its own row in pools that include Stages. Its tasks are not affected.
Add an existing task to work pools
- Open the project's tasks list.
- Select the task to open its detail panel.
- Above Task Dependencies, tick Show this task in work pools.
The change saves immediately.
Add a new task or stage directly into pools
- In the project's tasks list, use the inline Add Task or Add Section row.
- Tick the work pools checkbox in that row before saving.
- Save the row.
The new item is eligible from the moment it exists. The checkbox resets to unticked for the next item you add.
Remove work from pools
Untick the same checkbox. The item leaves every pool immediately and the pool counts drop.
Tasks added to a project after it was created are not eligible automatically. Template settings copy onto tasks only when the project is created. Tick later tasks individually.
An item with an assignee or owner never pools. If a ticked item is missing, check whether someone is already assigned to it.
Inactive, closed and canceled projects are excluded from pools regardless of their checkboxes.
Related
- Create and manage work pools
- Claim work from a work pool
- Work pool settings and permissions reference
- How work pools decide what staff can see and claim