This article applies to firms using Aiwyn Practice.
In about 20 minutes, create one work pool, put a task into it, and claim that task from the Home dashboard. By the end you will have seen every surface Work Pools adds to Aiwyn and understand how work travels from a project into a staff member's hands.
Before you start
- Work Pools is turned on for your firm. If you don't see Work Pools under Settings → Project Management, contact Aiwyn Support.
- You hold the View Work Pool and Create Work Pool permissions in the Project Management permission group. See Work pool settings and permissions reference.
- You have a project with at least one task that has no assignee. Note the project's office, service line and the task's work code; you will match them in step 2.
- Your own staff role is one you can pick in step 3, so the pool is visible to you.
Steps
1. Open Work Pools
- Select Settings in the left sidebar.
- Under Project Management, select Work Pools.
If your firm has no pools yet, the page reads "There are currently no work pools."
2. Create a pool
- Select New Work Pool.
- In Pool Name, type Getting Started Pool.
- In Roles, pick your own staff role.
- In Work Items, pick Tasks.
- Leave the two readiness checkboxes ticked.
- Leave Offices, Service Lines, Work Codes and Project Deliverables empty. Empty means the pool accepts work from anywhere.
- Select Create Pool.
The pool appears in the table with Items at 0 and Viewers showing how many staff hold the role you picked.
3. Put a task into the pool
- Open your test project.
- In the tasks list, select a task that has no assignee to open its detail panel.
- Tick Show this task in work pools. The change saves immediately.
- Return to Settings → Project Management → Work Pools. The pool's Items count is now 1.
- Select the pool row. The side drawer opens; the Items tab lists your task with its due date.
4. See the pool on Home
- Select Home in the left sidebar.
- In the Action Items card, select the Work Pool tab. The tab carries a badge with the item count.
- Find your task. The row shows its name, the client, hours, due date and how long it has been in the pool.
5. Claim the task
- Select Assign to Me on the row.
- The row changes to Added to Action Items with an Undo button.
- Select Undo once to see the task return to the pool, then select Assign to Me again.
- Select the Action Items tab. The task is now in your personal list.
- Open the project. The task's Assignee is you.
6. Clean up
- Back in Settings → Project Management → Work Pools, open the row menu on Getting Started Pool and select Delete, then confirm.
- The task stays assigned to you. Deleting a pool never changes the work in it.
What you learned
- A pool is a filter: it shows work that is marked eligible, matches its criteria, and that nobody owns yet.
- Work opts in through a checkbox on the task, stage, project or template.
- Staff see pools on Home → Work Pool and claim with one click. Claiming makes them the assignee and removes the item from everyone else's view.
Next step for a real rollout. Create one pool per queue your firm runs (for example a prep pool and a review pool), narrow each by work code, and tick the template-level checkboxes so new projects feed the pools automatically. See Add projects, stages and tasks to work pools.